le 3 March 2016

Delivery of a bridge mould

Martinez Ship Construction delivers a mould of a bridge for the new OUTREMER 45 from the OUTREMER shipyard. This 100m² mould has just sealed the deal between the two shipyards.

En savoir plus

le 3 March 2016

Stripping of the M3 yacht

The stripping of the new M3 yacht’s hull at the Martinez Shipyard is planned for September 2014.

En savoir plus

le 3 March 2016

Martinez shipyard constructed a clock tower

Martinez shipyard constructed a clock tower during the renovation of the BELLE EPINE shopping centre from Thiais in the Val de Marne, the know-how of Martinez Shipyard was requested for the construction of a tower. Designed and built as a decorative object, this work of 10 meters high and 4 meters in diameter designed by a designer perfectly matches the […]

En savoir plus